Seattle, WA · residential
Driven Piles Remedy Foundation Failure
A Seattle home had settled 2¾" where it met the front porch. 7 driven piles plus steel support lifted it and passed independent load testing by Redmond Geotechnical.

7
piles
2.75
in. settled
1
in. lifted
Your home could be next
Wondering what your project would take?
It starts with a free, honest evaluation — and if nothing’s wrong, we’ll tell you that too.
Free · About 90 minutes · No obligation
