The proof
Real projects, real numbers.
Every case study below is a published Ram Jack West project — with the actual pile counts, depths, and lifts. No stock photos, no vague claims. Filter to your area or your problem.
Across our published case studies
44 of 44 published case studies

62-Year-Old Seattle Home Recovery
A 1959 Seattle home revealed ~2.5" of settlement at purchase. 24 piles at 12–17 ft permanently supported it and passed Seattle's load testing.

Driven Piles Remedy Foundation Failure
A Seattle home had settled 2¾" where it met the front porch. 7 driven piles plus steel support lifted it and passed independent load testing by Redmond Geotechnical.

Seattle Seawall & Bulkhead Repair
A 30-year-old Seattle bulkhead bowed at mid-span from soil loss. Helical tiebacks, SW-RP1 injection, and carbon fiber restored it for ~80% less than replacement.
Washington Park Arboretum Loop Trail
24 helical piles supported two bridges on Seattle's environmentally sensitive Arboretum loop trail.

Durable Solution for Sloping Floors
A 91-year-old Renton home sat 4¼" low front-to-back. 17 helical piles + foam recovered ~3" in 6 days.

Lakefront Settlement, Bellevue
A Lake Sammamish home settled up to 5" from high water tables. 74 piles to 34 ft lifted it 4".

Innisglen Condominiums, Bellevue
Two HOA condo units settled 3.5". 42 helical piles recovered 2.75" and re-leveled doors, floors, and a pulling fireplace in 6 days.

40 Helical Piles, Tacoma Residence
Puyallup Tribal Housing: 40 helical piles + foam lifted a settling Tacoma home 3.5" ahead of a full remodel.

Support of Tacoma Home
A 1979 Tacoma home on a sloped lot settled 1.5". 4 helical + 3 driven piles plus carbon fiber straps stabilized the cracked stem wall.

Settled Residence, Cashmere
A Cashmere home dropped 2.5" near a creek. 4 helical piers re-leveled it in under 48 hours.

Gig Harbor Waterfront Seawall
A 115-ft Puget Sound seawall failing from soil loss: 11 helical tiebacks, 195 gal foam, drains, and 6 carbon fiber straps restored it.

Tacoma City Hall Seismic Upgrade
When helical piles couldn't reach torque in stiff soil, Ram Jack value-engineered a micropile solution with the geotechnical engineer for this civic seismic upgrade.

Vancouver Home Retaining Wall
19 steel H-beams with timber lagging leveled a sloped Vancouver, WA yard to the home's lower-floor elevation.

Alaskan Earthquake Recovery
After the 2018 M7.1 quake liquefied soil under an Anchorage home, 63 helical piles recovered 3" and damp future seismic forces.

Manzanita Two-Story Stabilization
13 helical piles lifted a Manzanita home to within ½" of level — most pre-existing cracks closed completely.

Restoring Home Value Before Selling
9 helical piers in 2 days fixed settlement before listing; the transferable lifetime warranty passed to the buyer at sale.

Supporting a Settled Foundation
13 exterior helical piles fully recovered a Eugene home's settlement (¾" lift) in 10 days, engineered with Regal Mortier.

Hayward Field Helical Anchors
Helical anchors secured hammer-throw cage towers for the 2022 World Athletics Championships without tearing up the competition surface.

New Construction Piles, Yachats
46 helical piles supported a retaining wall and strip footings on very soft coastal soils for new construction.

Oakway Substation Transformer Lift
4 helical piles + 2 tiebacks fully re-leveled a settled transformer pad within a tight utility window.

Residential Retaining Wall Repair
16 helical tieback piles + 24 steel beams arrested a rotated, failing Eugene retaining wall.

Strict-Seismic Foundation System
390 micropiles to 30 ft met strict seismic code on poor soil — validated by a full load-test program.

Swanson Saw Mill Rebuild
500+ custom helical piles rebuilt a mill foundation on contaminated post-fire fill, with torque exceeding 25,000 ft-lbs.

Portland Retaining Wall Spotlight
An engineered retaining wall restored usable, stable yard space on a Portland slope.

Cantilevered Wall for Fire-Lane Compliance
A 170-ft custom steel cantilevered wall met fire-lane code while preserving buildable area on a tight Portland site.
Portland Multi-Unit Recovery
27 piles to 60 ft lifted two Portland apartment buildings 3" in 11 days with minimal tenant disruption.

Portland Hillside New Construction
Grouted micropiles provided pre-construction deep-foundation support on a Portland hillside.

New Public Library, Gladstone
Micropiles + a soldier pile wall protected neighbors during construction of a 6,000 sq ft public library.

Spring Mountain Elementary Wall
Carbon fiber (SRS-600/660) + tiebacks rescued a bowing school playground wall without full reconstruction.

Patton Middle School Seismic Retrofit
270 helical piles to 65 ft seismically retrofit a 1972 school — finished ahead of schedule without interrupting the school year.

Adams School Campus Micropiles
84 low-headroom micropiles (~75 LF) reinforced an existing school foundation in confined space.

Bandon House New Construction
83 cased micropiles into mudstone bedrock mitigated liquefaction and lateral-spreading hazards for new construction.

Camp Namana Cabins
256 pin piles stabilized 8 cabins on large-scale landslide terrain, verified by 8 test piles.

Dollar General, Philomath
143 driven pin piles created a stable foundation for new retail construction.

PacifiCorp Seismic-Code Foundation
18 cased grouted micropiles (64 kips each) met seismic criteria for a PacifiCorp facility upgrade, validated by sacrificial test piles.

US-101 Retaining Wall (ODOT)
63 H-piles + steel lagging built a 700+ ft ODOT retaining wall along US-101 without lane closures.

Newport Hotel Retaining Wall
A 45-ft H-pile wall stopped a hotel lawn from sliding toward the beach 70 ft below — done in 5 days without closing the hotel.

Salishan Helicals
45 helical piles with pre-construction caps supported new construction at Salishan.

Spring St. Duplex
41 micropiles to 35 ft (load-tested to 200% capacity) supported a new duplex on the coast.

View Point Inn & Wellness Center
Full-building temporary support let crews excavate a new basement beneath an existing inn and replace the foundation.

Coos Bay Landslide Wall
A 150-ft, 22-pile soldier wall protected a home after a landslide pushed a hillside 4 ft onto its siding.

Crumbling Rock Wall
Soil nails stabilized a deteriorating rock wall threatening a public road.
Washington, DCDC Water Flood Protection
SW-RP1 grout injection created subsurface flood barriers for a D.C. drinking-water facility where sheet piles were impossible.

Custom Micropile Brackets (GM, Sparks NV)
Ram Jack designed proprietary micropile brackets to anchor 14 piles into rocky soil for a GM distribution-center seismic retrofit — showcasing in-house engineering.
Your home could be the next case study
Wondering what your project would look like?
It starts with a free, honest evaluation — and if nothing’s wrong, we’ll tell you that too.
Free · About 90 minutes · No obligation