62-Year-Old Seattle Home Recovery, Seattle, WA — driven piles, 24 piles
Seattle, WA

62-Year-Old Seattle Home Recovery

A 1959 Seattle home revealed ~2.5" of settlement at purchase. 24 piles at 12–17 ft permanently supported it and passed Seattle's load testing.

24
piles
12–17
ft deep
2.5
in. settled
Driven Piles Remedy Foundation Failure, Seattle, WA — driven piles, 1" lift
Seattle, WA

Driven Piles Remedy Foundation Failure

A Seattle home had settled 2¾" where it met the front porch. 7 driven piles plus steel support lifted it and passed independent load testing by Redmond Geotechnical.

7
piles
2.75
in. settled
1
in. lifted
Seattle Seawall & Bulkhead Repair, Seattle, WA — seawall, waterfront
Seattle, WA

Seattle Seawall & Bulkhead Repair

A 30-year-old Seattle bulkhead bowed at mid-span from soil loss. Helical tiebacks, SW-RP1 injection, and carbon fiber restored it for ~80% less than replacement.

~80% less
vs replacement
Seattle, WA

Washington Park Arboretum Loop Trail

24 helical piles supported two bridges on Seattle's environmentally sensitive Arboretum loop trail.

24
piles
20–25
ft deep
2
bridges
Durable Solution for Sloping Floors, Renton, WA — helical piles, 17 piles
Renton, WA

Durable Solution for Sloping Floors

A 91-year-old Renton home sat 4¼" low front-to-back. 17 helical piles + foam recovered ~3" in 6 days.

17
piles
4.25
in. settled
3
in. recovered
Lakefront Settlement, Bellevue, Bellevue, WA — helical piles, 4" lift
Bellevue, WA

Lakefront Settlement, Bellevue

A Lake Sammamish home settled up to 5" from high water tables. 74 piles to 34 ft lifted it 4".

74
piles
34
ft deep
5
in. settled
Innisglen Condominiums, Bellevue, Bellevue, WA — helical piles, 42 piles
Bellevue, WA

Innisglen Condominiums, Bellevue

Two HOA condo units settled 3.5". 42 helical piles recovered 2.75" and re-leveled doors, floors, and a pulling fireplace in 6 days.

42
piles
3.5
in. settled
2.75
in. recovered
40 Helical Piles, Tacoma Residence, Tacoma, WA — helical piles, 3.5" lift
Tacoma, WA

40 Helical Piles, Tacoma Residence

Puyallup Tribal Housing: 40 helical piles + foam lifted a settling Tacoma home 3.5" ahead of a full remodel.

40
piles
3.5
in. lifted
Support of Tacoma Home, Tacoma, WA — helical piles, residential
Tacoma, WA

Support of Tacoma Home

A 1979 Tacoma home on a sloped lot settled 1.5". 4 helical + 3 driven piles plus carbon fiber straps stabilized the cracked stem wall.

4
helical piles
3
driven piles
1.5
in. settled
Settled Residence, Cashmere, Cashmere, WA — helical piles, residential
Cashmere, WA

Settled Residence, Cashmere

A Cashmere home dropped 2.5" near a creek. 4 helical piers re-leveled it in under 48 hours.

4
piers
2.5
in. settled
48
hours
Gig Harbor Waterfront Seawall, Gig Harbor, WA — seawall, waterfront
Gig Harbor, WA

Gig Harbor Waterfront Seawall

A 115-ft Puget Sound seawall failing from soil loss: 11 helical tiebacks, 195 gal foam, drains, and 6 carbon fiber straps restored it.

115
ft of seawall
11
tiebacks
195
gal foam
Tacoma City Hall Seismic Upgrade, Tacoma, WA — micropiles, commercial
Tacoma, WA

Tacoma City Hall Seismic Upgrade

When helical piles couldn't reach torque in stiff soil, Ram Jack value-engineered a micropile solution with the geotechnical engineer for this civic seismic upgrade.

Vancouver Home Retaining Wall, Vancouver, WA — retaining wall, residential
Vancouver, WA

Vancouver Home Retaining Wall

19 steel H-beams with timber lagging leveled a sloped Vancouver, WA yard to the home's lower-floor elevation.

19
steel beams
Alaskan Earthquake Recovery, Anchorage, AK — helical piles, 63 piles
Anchorage, AK

Alaskan Earthquake Recovery

After the 2018 M7.1 quake liquefied soil under an Anchorage home, 63 helical piles recovered 3" and damp future seismic forces.

63
piles
3
in. recovered
Manzanita Two-Story Stabilization, Manzanita, OR — helical piles, 13 piles
Manzanita, OR

Manzanita Two-Story Stabilization

13 helical piles lifted a Manzanita home to within ½" of level — most pre-existing cracks closed completely.

13
piles
2.5
in. settled
0.5
in. final deviation
Restoring Home Value Before Selling, Blue River, OR — helical piles, residential
Blue River, OR

Restoring Home Value Before Selling

9 helical piers in 2 days fixed settlement before listing; the transferable lifetime warranty passed to the buyer at sale.

9
piers
2
days
Supporting a Settled Foundation, Eugene, OR — helical piles, 0.75" lift
Eugene, OR

Supporting a Settled Foundation

13 exterior helical piles fully recovered a Eugene home's settlement (¾" lift) in 10 days, engineered with Regal Mortier.

13
piles
0.75
in. lifted
10
days
Hayward Field Helical Anchors, Eugene, OR — helical piles, 4 piles
Eugene, OR

Hayward Field Helical Anchors

Helical anchors secured hammer-throw cage towers for the 2022 World Athletics Championships without tearing up the competition surface.

4
piles
New Construction Piles, Yachats, Yachats, OR — helical piles, 46 piles
Yachats, OR

New Construction Piles, Yachats

46 helical piles supported a retaining wall and strip footings on very soft coastal soils for new construction.

46
piles
Oakway Substation Transformer Lift, Eugene, OR — helical piles, 4 piles
Eugene, OR

Oakway Substation Transformer Lift

4 helical piles + 2 tiebacks fully re-leveled a settled transformer pad within a tight utility window.

4
piles
100%
recovered
Residential Retaining Wall Repair, Eugene, OR — retaining wall, residential
Eugene, OR

Residential Retaining Wall Repair

16 helical tieback piles + 24 steel beams arrested a rotated, failing Eugene retaining wall.

16
tiebacks
24
steel beams
Strict-Seismic Foundation System, Eugene, OR — micropiles, 390 piles
Eugene, OR

Strict-Seismic Foundation System

390 micropiles to 30 ft met strict seismic code on poor soil — validated by a full load-test program.

390
piles
30
ft deep
Swanson Saw Mill Rebuild, Springfield, OR — helical piles, 500+ piles
Springfield, OR

Swanson Saw Mill Rebuild

500+ custom helical piles rebuilt a mill foundation on contaminated post-fire fill, with torque exceeding 25,000 ft-lbs.

500+
piles
75
kips
Portland Retaining Wall Spotlight, Portland, OR — retaining wall, residential
Portland, OR

Portland Retaining Wall Spotlight

An engineered retaining wall restored usable, stable yard space on a Portland slope.

Cantilevered Wall for Fire-Lane Compliance, Portland, OR — retaining wall, commercial
Portland, OR

Cantilevered Wall for Fire-Lane Compliance

A 170-ft custom steel cantilevered wall met fire-lane code while preserving buildable area on a tight Portland site.

170
ft of wall
Portland, OR

Portland Multi-Unit Recovery

27 piles to 60 ft lifted two Portland apartment buildings 3" in 11 days with minimal tenant disruption.

27
piles
60
ft deep
3
in. lifted
Portland Hillside New Construction, Portland, OR — micropiles, commercial
Portland, OR

Portland Hillside New Construction

Grouted micropiles provided pre-construction deep-foundation support on a Portland hillside.

New Public Library, Gladstone, Gladstone, OR — micropiles, civil
Gladstone, OR

New Public Library, Gladstone

Micropiles + a soldier pile wall protected neighbors during construction of a 6,000 sq ft public library.

6000
sq ft
Spring Mountain Elementary Wall, Happy Valley, OR — carbon fiber, commercial
Happy Valley, OR

Spring Mountain Elementary Wall

Carbon fiber (SRS-600/660) + tiebacks rescued a bowing school playground wall without full reconstruction.

Patton Middle School Seismic Retrofit, McMinnville, OR — helical piles, 270 piles
McMinnville, OR

Patton Middle School Seismic Retrofit

270 helical piles to 65 ft seismically retrofit a 1972 school — finished ahead of schedule without interrupting the school year.

270
piles
65
ft deep
2
months
Adams School Campus Micropiles, McMinnville, OR — micropiles, 84 piles
McMinnville, OR

Adams School Campus Micropiles

84 low-headroom micropiles (~75 LF) reinforced an existing school foundation in confined space.

84
piles
75
ft deep
Bandon House New Construction, Bandon, OR — micropiles, 83 piles
Bandon, OR

Bandon House New Construction

83 cased micropiles into mudstone bedrock mitigated liquefaction and lateral-spreading hazards for new construction.

83
piles
50
ft deep
Camp Namana Cabins, Sandy, OR — driven piles, 256 piles
Sandy, OR

Camp Namana Cabins

256 pin piles stabilized 8 cabins on large-scale landslide terrain, verified by 8 test piles.

256
piles
21
ft deep
5
weeks
Dollar General, Philomath, Philomath, OR — driven piles, 143 piles
Philomath, OR

Dollar General, Philomath

143 driven pin piles created a stable foundation for new retail construction.

143
piles
21
ft deep
PacifiCorp Seismic-Code Foundation, Pacific Northwest, OR — micropiles, 18 piles
Pacific Northwest, OR

PacifiCorp Seismic-Code Foundation

18 cased grouted micropiles (64 kips each) met seismic criteria for a PacifiCorp facility upgrade, validated by sacrificial test piles.

18
piles
64
kips
3
weeks
US-101 Retaining Wall (ODOT), Florence, OR — soldier pile, 63 piles
Florence, OR

US-101 Retaining Wall (ODOT)

63 H-piles + steel lagging built a 700+ ft ODOT retaining wall along US-101 without lane closures.

63
piles
700
ft of wall
32
ft deep
Newport Hotel Retaining Wall, Newport, OR — retaining wall, 8 piles
Newport, OR

Newport Hotel Retaining Wall

A 45-ft H-pile wall stopped a hotel lawn from sliding toward the beach 70 ft below — done in 5 days without closing the hotel.

45
ft of wall
8
piles
5
days
Salishan Helicals, Lincoln City, OR — helical piles, 45 piles
Lincoln City, OR

Salishan Helicals

45 helical piles with pre-construction caps supported new construction at Salishan.

45
piles
Spring St. Duplex, Newport, OR — micropiles, 41 piles
Newport, OR

Spring St. Duplex

41 micropiles to 35 ft (load-tested to 200% capacity) supported a new duplex on the coast.

41
piles
35
ft deep
View Point Inn & Wellness Center, Corbett, OR — helical piles, commercial
Corbett, OR

View Point Inn & Wellness Center

Full-building temporary support let crews excavate a new basement beneath an existing inn and replace the foundation.

8
steel beams
Coos Bay Landslide Wall, Coos Bay, OR — soldier pile, 22 piles
Coos Bay, OR

Coos Bay Landslide Wall

A 150-ft, 22-pile soldier wall protected a home after a landslide pushed a hillside 4 ft onto its siding.

22
piles
150
ft of wall
16–18
ft deep
Crumbling Rock Wall, Pacific Northwest, OR — retaining wall, civil
Pacific Northwest, OR

Crumbling Rock Wall

Soil nails stabilized a deteriorating rock wall threatening a public road.

Washington, DC

DC Water Flood Protection

SW-RP1 grout injection created subsurface flood barriers for a D.C. drinking-water facility where sheet piles were impossible.

33
ft deep
Custom Micropile Brackets (GM, Sparks NV), Sparks, NV — micropiles, 14 piles
Sparks, NV

Custom Micropile Brackets (GM, Sparks NV)

Ram Jack designed proprietary micropile brackets to anchor 14 piles into rocky soil for a GM distribution-center seismic retrofit — showcasing in-house engineering.

14
piles
35
kips

Your home could be the next case study

Wondering what your project would look like?

It starts with a free, honest evaluation — and if nothing’s wrong, we’ll tell you that too.

Free · About 90 minutes · No obligation